Bedford County, VA Roof Snow Load - 20 psf
Bedford County, VA: your roof's ASCE 7 snow number, in plain English
Bedford County's roofs are built to hold 20 psf of snow, the ASCE 7-22 figure a permit reviewer checks first. §7.3.4's low-slope minimum of 20 psf is what actually governs on a flat or low-pitch roof here - higher than the 17.5 psf the base ground-load formula gives.
In depth, not weight: that's roughly 44 inches of fresh, light snow, 16 inches of old, settled snow, or as little as 4 inches of solid ice - snow that heavy is rare here but ice from a freeze-thaw cycle adds up far faster than the depth suggests. Modern-code homes carry a load like this without issue; an older addition, a carport, or any flat-roofed section is where it is worth checking first.
Bedford County, VA: quick facts
- Design roof snow load20 psf
- Ground snow load, ASCE 7 map25 psf
- National rank#675 of 2,758
- Virginia rank#24 of 110
- Population82,182
- Annual snowfall, NOAA normal5.9 in.
- FIPS51019
Bedford County by the numbers
Nationally that's #675 out of 2,758 rated counties, the top 24%; within Virginia alone, Bedford County ranks #24 of 110. That's 1.7 psf above Virginia's own county-average design load of 18.3 psf.
Bedford County, FIPS 51019, is home to 82,182 people near 37.3123°N 79.5272°W. Its 25 psf ground snow load figure is the map value; 20 psf is what a roof is actually designed for.
Bedford County's snowfall, most winters
5.9 in. a year: that's Bedford County's NOAA 1991-2020 snowfall normal, measured at HUDDLESTON 4 SW, VA US (12.9 mi away). See the density guide.
Before you rely on Bedford County's number
Treat the Bedford County figure as a starting point, not a final answer: it assumes standard occupancy, a heated structure and a moderately sheltered site, per ASCE 7-22's own defaults. Exposed terrain, an unheated building or a steeper roof all shift the real number.
For a real application, skip the county number and go straight to the ASCE 7 Hazard Tool - enter your coordinates and it returns a site-specific figure a plan reviewer will recognize. (How this figure is calculated.)