Otero County, CO Roof Snow Load - 20 psf
Otero County, CO: your roof's ASCE 7 snow number, in plain English
Otero County's roofs are built to hold 20 psf of snow, the ASCE 7-22 figure a permit reviewer checks first. ASCE 7's low-slope-roof minimum (§7.3.4) raises the governing figure to 20 psf - higher than the 14 psf the ground-load formula alone would give, and the code says use the larger one.
In depth, not weight: that's roughly 44 inches of fresh, light snow, 16 inches of old, settled snow, or as little as 4 inches of solid ice - snow that heavy is rare here but ice from a freeze-thaw cycle adds up far faster than the depth suggests. A meaningful design load. Most homes built to modern code handle it, but additions, carports, and flat-roofed sections are worth a second look.
Otero County in numbers
- Design roof snow load20 psf
- Ground snow load, ASCE 7 map20 psf
- National rank#982 of 2,758
- Colorado rank#11 of 24
- Population17,991
- Annual snowfall, NOAA normal24.8 in.
- FIPS08089
Otero County by the numbers
Nationally that's #982 out of 2,758 rated counties, the top 36%; within Colorado alone, Otero County ranks #11 of 24. Colorado counties average 17.7 psf; Otero County runs 2.3 psf higher than that.
Otero County, FIPS 08089, is home to 17,991 people near 37.8842°N 103.7213°W. Its 20 psf ground snow load figure is the map value; 20 psf is what a roof is actually designed for.
Otero County's snowfall, most winters
24.8 in. a year: that's Otero County's NOAA 1991-2020 snowfall normal, measured at ROCKY FORD 2 SE, CO US (10.7 mi away). See the density guide.
Before you rely on Otero County's number
Treat the Otero County figure as a starting point, not a final answer: it assumes standard occupancy, a heated structure and a moderately sheltered site, per ASCE 7-22's own defaults. Exposed terrain, an unheated building or a steeper roof all shift the real number.
For a real application, skip the county number and go straight to the ASCE 7 Hazard Tool - enter your coordinates and it returns a site-specific figure a plan reviewer will recognize. (How this figure is calculated.)