Phillips County, CO Roof Snow Load - 20 psf
Phillips County, CO: your roof's ASCE 7 snow number, in plain English
Phillips County's roofs are built to hold 20 psf of snow, the ASCE 7-22 figure a permit reviewer checks first. The physics-based figure alone would be 14 psf, but ASCE 7's own low-slope minimum (§7.3.4) sets a floor of 20 psf for flat and low-pitch roofs here, which is the number that actually governs.
In depth, not weight: that's roughly 44 inches of fresh, light snow, 16 inches of old, settled snow, or as little as 4 inches of solid ice - snow that heavy is rare here but ice from a freeze-thaw cycle adds up far faster than the depth suggests. This is a meaningful design load - most modern-code homes handle it fine, though an addition, a carport or a flat-roofed section can be a weak spot.
Phillips County at a glance
- Design roof snow load20 psf
- Ground snow load, ASCE 7 map20 psf
- National rank#1,230 of 2,758
- Colorado rank#16 of 24
- Population4,488
- Annual snowfall, NOAA normal30.4 in.
- FIPS08095
Phillips County by the numbers
Nationally that's #1,230 out of 2,758 rated counties, the top 45%; within Colorado alone, Phillips County ranks #16 of 24. Colorado counties average 17.7 psf; Phillips County runs 2.3 psf higher than that.
Phillips County, FIPS 08095, is home to 4,488 people near 40.5947°N 102.3451°W. Its 20 psf ground snow load figure is the map value; 20 psf is what a roof is actually designed for.
Phillips County's snowfall, most winters
30.4 in. a year: that's Phillips County's NOAA 1991-2020 snowfall normal, measured at HOLYOKE, CO US (3.4 mi away). See the density guide.
Before you rely on Phillips County's number
Treat the Phillips County figure as a starting point, not a final answer: it assumes standard occupancy, a heated structure and a moderately sheltered site, per ASCE 7-22's own defaults. Exposed terrain, an unheated building or a steeper roof all shift the real number.
For a real application, skip the county number and go straight to the ASCE 7 Hazard Tool - enter your coordinates and it returns a site-specific figure a plan reviewer will recognize. (How this figure is calculated.)