Tyler County, WV Roof Snow Load - 20 psf
Tyler County, WV: your roof's ASCE 7 snow number, in plain English
Tyler County's roofs are built to hold 20 psf of snow, the ASCE 7-22 figure a permit reviewer checks first. §7.3.4's low-slope minimum of 20 psf is what actually governs on a flat or low-pitch roof here - higher than the 14 psf the base ground-load formula gives.
In depth, not weight: that's roughly 44 inches of fresh, light snow, 16 inches of old, settled snow, or as little as 4 inches of solid ice - snow that heavy is rare here but ice from a freeze-thaw cycle adds up far faster than the depth suggests. This is a meaningful design load - most modern-code homes handle it fine, though an addition, a carport or a flat-roofed section can be a weak spot.
Tyler County, WV: quick facts
- Design roof snow load20 psf
- Ground snow load, ASCE 7 map20 psf
- National rank#1,151 of 2,758
- West Virginia rank#28 of 34
- Population7,843
- Annual snowfall, NOAA normal27.3 in.
- FIPS54095
Tyler County by the numbers
Nationally that's #1,151 out of 2,758 rated counties, the top 42%; within West Virginia alone, Tyler County ranks #28 of 34. Tyler County's figure lands almost exactly on West Virginia's own county-average of 20 psf.
Tyler County, FIPS 54095, is home to 7,843 people near 39.4656°N 80.8772°W. Its 20 psf ground snow load figure is the map value; 20 psf is what a roof is actually designed for.
Tyler County's snowfall, most winters
27.3 in. a year: that's Tyler County's NOAA 1991-2020 snowfall normal, measured at MIDDLEBOURNE 3 ESE, WV US (1.1 mi away). See the density guide.
Before you rely on Tyler County's number
Treat the Tyler County figure as a starting point, not a final answer: it assumes standard occupancy, a heated structure and a moderately sheltered site, per ASCE 7-22's own defaults. Exposed terrain, an unheated building or a steeper roof all shift the real number.
For a real application, skip the county number and go straight to the ASCE 7 Hazard Tool - enter your coordinates and it returns a site-specific figure a plan reviewer will recognize. See the methodology guide.